Comms Architecture Animation#
A notional, looping animation of the Project 5 strike package seen as a communication network. Satellites pass overhead, and data moves over X-band, Ka-band, S-band, and laser links while the IADS uses fiber and RF on the ground. Partway through each 60-second loop, an S-band jammer attacks the CubeSat link to the F-47s.
What to Watch#
Every link is a Friis problem. Each line between two platforms is a transmitter, a path, and a receiver. The power that arrives depends on the transmit power, both antenna gains, the wavelength, and the distance.
Frequency choices. The links use different bands: X-band (9 GHz) from MILCOM to the B-21s, Ka-band (20 GHz) from the Loyal Wingmen to the F-47s, S-band (3.00 GHz) from the CubeSat to the F-47s, and a laser crosslink from MILCOM to the CubeSat. For fixed antenna gains, a higher frequency means a shorter wavelength and more path loss.
Distance. The GEO MILCOM satellite is 35,786 km up, while the CubeSat is at 200 km. Friis says received power falls with the square of the distance.
Jamming is noise. When the S-band jammer comes on, its signal competes with the link signal at the receiver. The SNR drops, the link-quality bar falls, and the link shows JAMMED.
The numbers you need. The panel lists the jammer, F-47, and CubeSat transmit power, frequency, gain, and range: the inputs to a Friis and SNR calculation for this link.
The same animation also appears with the IADS material in Lesson 37.