Project 5 Animations#

Two notional, looping animations of the Project 5 scenario. Each loop runs for 60 seconds and then repeats.

Comms Architecture and Data Flows#

The same strike package, seen as a communication network. Satellites pass overhead, and data moves over X-band, Ka-band, S-band, and laser links while the IADS uses fiber and RF on the ground. Partway through each loop, an S-band jammer attacks the CubeSat link to the F-47s.

Animation · Comms Architecture · Lesson 37 Open full-screen ↗

What to Watch#

  • Orbits. The LEO satellites move faster than the GEO MILCOM satellite, and the lowest orbit (the CubeSat) moves fastest.

  • Link types. Each link is matched to its job: X-band from MILCOM to the B-21s, Ka-band from the Loyal Wingmen to the F-47s, S-band from the CubeSat to the F-47s, and a laser crosslink from MILCOM to the CubeSat.

  • The IADS network. On the ground, fiber ties the radars to C2, and RF links carry cueing from C2 to the SA-21 launchers.

  • Jamming a link. When the S-band jammer comes on, the CubeSat-to-F-47 link drops to JAMMED and the link-quality bar falls. The panel lists the jammer, F-47, and CubeSat transmit parameters.